aarjn/evm-smart-contracts SLOC report

As of 2026-05-29 (commit 77f37d072a39), aarjn/evm-smart-contracts contains 184,132 total lines: 138,385 code, 25,881 comments, 19,866 blank, across 861 files in 16 languages (top: Solidity 54.4%). Counted with tokei via OctoCounts.

As of 2026-05-29 (commit 77f37d072a39), aarjn/evm-smart-contracts contains 184,132 total lines: 138,385 code, 25,881 comments, 19,866 blank, across 861 files in 16 languages (top: Solidity 54.4%). Counted with tokei via OctoCounts.

OctoCounts produced this report by resolving aarjn/evm-smart-contracts to commit 77f37d072a39, downloading the repository source archive, and counting every source file with tokei, the open-source line counter written in Rust. The table below breaks the count down by programming language into files, total lines, code lines, comment lines, and blank lines, so the figures can be compared across languages and projects. Results are cached by commit, tokei version, and analysis options, so counting the same revision again reproduces exactly these numbers.

Repository size insights

This is a large codebase by counted code lines. Code represents 75.2% of all lines, comments represent 14.1%, and the repository averages 161 code lines per file. Solidity accounts for 54.4% of counted code.

LanguageFilesLinesCodeCommentsBlanks
Solidity444109790753062240412080
JSON82301623016200
JavaScript21132206264668634877
RPM Specfile31457138070764
Python31927153112384
AsciiDoc127874770310
Shell163512055888
TypeScript3167132728
TOML151591261320
YAML2827930
Makefile15435910
GraphQL1252302

Top language (Solidity 54.4%). Generated at 2026-05-29T18:08:02.425394265+00:00.

Report FAQ

How many lines of code does aarjn/evm-smart-contracts have?

aarjn/evm-smart-contracts has 184,132 total lines, including 138,385 code lines, 25,881 comment lines, and 19,866 blank lines.

How was the aarjn/evm-smart-contracts line count measured?

OctoCounts resolved the public GitHub repository to commit 77f37d072a39, downloaded the source archive, counted it with tokei, and cached the report by commit, tokei version, and analysis options.

What commit was counted for aarjn/evm-smart-contracts?

This OctoCounts report was generated from main at commit 77f37d072a39 on 2026-05-29T18:08:02.425394265+00:00.

Similar repository reports

Other public repositories with an OctoCounts report, ranked by top language and code size similarity: